FOR STUDIOS · GYMS · PROJECT BUYERS

Commercial Pilates Reformers

Equipping a studio is not a larger version of buying one reformer. The decisions that move a project are the unit mix across rooms, keeping one supplier version consistent across the batch, sequencing delivery into a building that may still be under fit-out, and agreeing who assembles and hands over the floor.

STUDIO GYM MULTI-SITE SUITABILITY PENDING
STUDIO INSTALLATION PHOTOStudio photography pendingMulti-unit floor photo required
01 / WHAT CHANGES AT STUDIO SCALE

Four things that decide a studio order, and none of them is the unit price.

A single-bed buyer chooses a model. A studio buyer chooses a structure — and that structure is what the quotation is actually built on.

01

Unit mix

A room rarely runs one identical configuration throughout. The balance between primary and secondary units changes both the quotation and how the floor is programmed.

02

Version consistency

Each series exists in more than one supplier version. A batch has to be locked to one version, otherwise spares and user experience diverge across the same room.

03

Phased delivery

Fit-out rarely finishes when the goods are ready. Delivery sequence and interim storage are agreed before production, not after.

04

Handover

Who unpacks, who assembles, who trains the instructors — this decides the opening date more often than the shipping date does.

02 / PROCUREMENT BRIEF

Six things to settle before a studio quotation means anything.

Send these six and the reply can be a real project quotation rather than a price per unit. Each one changes either the configuration or the delivery plan.

Table scrolls sideways on small screens →

What to settle Why it changes the quotation What to send us Status
Unit count and room structure One room and three rooms are different production plans, not different quantities of the same thing. Number of rooms and units per room Per quotation
Role of each unit Primary teaching units and secondary units are specified differently, which changes the mix and the unit price. How each group of units will be used Per quotation
Country and site conditions Destination decides packing format, unloading arrangements and the documents required at import. Country, city, floor level, unloading access Per quotation
Delivery sequence Fit-out dates and the readiness of the floor decide whether one shipment or several batches makes sense. Target opening date and any staging you already know Per quotation
Assembly and handover Whether units arrive assembled, and who trains the instructors, changes both cost and opening readiness. Whether you have a fitter or need it arranged Per quotation
Spares and documentation High-use floors need a spares position and the paperwork to maintain the equipment after handover. Which consumables and documents you need to hold Per quotation

Why no figures appear in this table: production capacity, minimum order quantities, batch lead times and warranty terms are commercial commitments that must be confirmed against the specific series and supplier version being quoted. Publishing a generic number here would commit us to something we have not verified. Each is answered in writing on the quotation for your project. Wholesale and bulk purchase ↗

03 / SUITABILITY

Which series are released for professional use.

This is the question a studio buyer asks first, and the one this page deliberately does not answer yet.

COMMERCIAL SUITABILITY PENDING

No series is currently confirmed for professional or high-frequency use.

Durability under daily multi-user operation, usage frequency limits, load capacity and warranty terms all require formal evidence before we put a series forward for a studio floor. That evidence is not in place yet, so no model is recommended here.

Two facts are available meanwhile: every series exists in more than one supplier version, and those versions differ in folding behaviour and packing. For a project order, the version has to be fixed in writing before production — that is the single most common source of mismatch between what a studio expects and what arrives.

04 / PROCUREMENT PATHS

Where this fits in a larger project.

This page covers reformer selection and the procurement brief. Room programming and trade terms sit on separate pages.

PROJECT QUOTATION · NO ONLINE CHECKOUT

Send the unit count, the country and the room plan.

Three things make a project quotation usable: how many units you intend to run, which country the floor is in, and what the studio is being set up for. Everything else — configuration, packing, delivery sequence — is built from those.

Request a Project Quote ↗